Skip to product information
1 of 12

Nanlux

Evoke 600C V-Mount Battery Power Station

Evoke 600C V-Mount Battery Power Station

Regular price $395.00 USD
Regular price Sale price $395.00 USD
Sale Sold out
  • Free shipping on orders over $50
  • Up to 3-year warranty
Quantity

SKU:BT-BPS-EVM

RUN 600C ON V-MOUNT
Attach two V-Mount batteries to run the Evoke 600C in the field or on set free of cables

HANDLES AC POWER
The Power Station also passes AC power for convenience

14.8V, 26V & 28V COMPATIBLE
This Power Station allows you to run the Evoke 600C on 14.8V, 26V, or 28V V-Mount batteries

MOUNTING OPTION
Features a mount for the separately available Nanlite ASCPQRFZ Super Clamp to attach to light stands and trusses

2-YEAR WARRANTY
Includes a 2-year limited warranty and it's stocked, serviced, and supported by dedicated teams in the USA

The Nanlux Evoke 600C V-Mount Battery Power Station provides a convenient way to run the Evoke 600C on battery power. It also lets you power the light on AC for greater flexibility, using the AC cable that comes with the 600C. The Power Station is compatible with 14.8V, 26V, and 28V V-Mount batteries. Two 26V or 28V batteries deliver up to 78% output, and AC power enables full output. A magnetic surface allows you to attach the WC-EXT Wired Controller (sold separately). The Power Station is P65-rated for reliable performance in rain, dust, and demanding outdoor environments.

In addition to having two V-Mount battery plates, a third mount is provided to attach the Power Station to light stands and trusses with the separately available Nanlite ASCPQRFZ Super Clamp.

View full details
Specifications Table
⚙ Specifications
Dimensions6.17×4×7.45" (156.8×101.6×189.3mm)
Weight3.86 lb (1.75kg)
What's in the Box Table
⁂ What's in the Box
BT-BPS-EVM Evoke 600C V-Mount Battery Power Station
DC Connection Cable 26.24' (8m)
User Manual
2-Year Limited Warranty